Aveva. Split Pipe

Sometime we need to split our pipe into several parts. We have standard utilities but sometimes its not suitable for current cases.

Без названия

Here you are few examples of PML macros that can split the branch.

link1
link2

Advertisements

Aveva. Admin. Reconfig DB with cross-references

Sometimes happens that we need to change DB number to other dbnumber.But what shoud we do with cross-references? Use the method that is described below and there will be no problems.

This is for experienced PDMS admins, anyway make backup before this steps!!!

If the contents of more than one DB are to be transferred, provided no reference attributes point outside the set of DBs being transferred, an extension of the same procedure could be used. Consider the transfer of the whole of one Design DB, the whole of a Catalogue DB and one item of equipment from a second Design DB, thus: